| Mesuring the speed of water flow |
| Near the source of the stream |
| The charge was on to get through the first gap |
| Indoor climbing for these students today due to the typical welsh summer conditions |
| Mesuring the speed of water flow |
| Near the source of the stream |
| The charge was on to get through the first gap |
| Indoor climbing for these students today due to the typical welsh summer conditions |
No comments:
Post a Comment